ASSESS BEFORE SELECTING

Build the decision on representative site evidence

A site assessment determines whether voltage optimisation is technically credible, operationally acceptable and commercially material. It should also identify when not to proceed.

What we review
  • Single-line diagrams, transformer and switchboard data, protection settings and earthing arrangements
  • Voltage at representative points, by phase and time
  • Energy, power, demand, operating schedules and material drivers
  • Load inventory and voltage-response categories
  • Remote, sensitive and critical loads
  • Solar PV, batteries, UPS, VSDs, power-factor equipment and existing regulators
  • Planned expansions, EV charging and portfolio constraints
Typical monitoring period

The duration is selected to capture representative operating states. A short survey may screen a stable site; a facility with seasonal, production or weather effects may require a longer interval model and additional operational data.

Assessment outputs
  • Voltage and load profile
  • Suitability and risk findings
  • Recommended control strategy and electrical boundary
  • Minimum-voltage and rating basis
  • Conservative net-savings estimate with assumptions and sensitivity
  • Outline business case and delivery constraints
  • Proposed M&V and commissioning approach
  • Proceed, investigate further or do-not-proceed recommendation
  • Information to prepare

Recent electricity data, site operating hours, major-load information, single-line diagrams, known power-quality issues, generation/storage details and planned load changes help accelerate the assessment.